A supplier audit is not a tour. The things that decide whether your liner survives are boring, physical, and mostly invisible in a showroom: whether the melt is analysed before pouring, whether the quench is recorded, whether the pattern is still the original shape after 400 pours. This checklist is what we would want a customer to check on us.
1 · Is there metal being poured, and can you see it?
The first question is not rude, it is the only one that matters: does this company melt and pour, or does it buy finished castings and machine them? Both are legitimate business models, but the price and the traceability are different, and the buyer should know which one they are buying from.
What to look for: an induction furnace with a power rating that matches the casting weights being quoted, molten metal in the building, and moulds being rammed. Ask what the largest single piece they can pour is, and what the furnace capacity is. A supplier who cannot answer in tonnes is not pouring.
2 · Is the chemistry checked before the pour, not after?
Manganese steel is decided at the spectrometer, not at the hardness tester. If the carbon or manganese is off, no amount of heat treatment recovers the part.
What to look for: a spectrometer in the foundry (not at a sister company across town), a log of heat analyses with times, and evidence that the analysis is taken from the furnace before tapping. Ask to see the last ten analyses and whether any heat was re-alloyed. A foundry that has never had to re-alloy a heat is either very good or not analysing.
3 · Is the heat treatment recorded per batch?
Water toughening at 1050–1100 °C is not a recipe, it is a curve: charging temperature, heating rate, soak time, quench transfer time. Without a record, the treatment is a rumour.
What to look for: a furnace with a chart recorder or a logged controller, a batch sheet that ties the heat number to the furnace load, and a quench tank large enough that the load does not boil it dry. Ask what happens when the quench is delayed — the honest answer is "we re-treat it", the dishonest one is "it doesn't happen".
4 · Are the patterns still the right shape?
This is the most under-inspected item in any foundry. A pattern wears, gets repaired, gets re-shipped, and after a few hundred pours the casting is 3 mm off the drawing. Nobody notices until a liner will not seat.
What to look for: pattern storage that is dry and organised, a pattern inspection interval written down, and at least one recent dimensional check of a casting against its drawing. Ask how often patterns are verified. A number in months is a good sign; "when there's a problem" is not.
5 · Is the inspection equipment in the same building as the castings?
Chemical analysis, hardness, metallography, and dimensional checking need to happen where the parts are, at the rate the parts are made. Inspection that happens by sending samples elsewhere is sampling, not control.
What to look for: a hardness tester with a calibration sticker in date, a metallographic microscope with prepared samples, a CMM or at minimum a surface plate and height gauge, and — critically — an inspection record for a recent order that you can follow from heat number to shipment.
The five questions that reveal the business model
- What is your largest single casting weight, and what furnace pours it?
- Can I see the spectrometer log for the heat that made my last order?
- Who signs the heat treatment batch sheet, and can I see one?
- When was your pattern for this part last dimensionally verified?
- If this liner fails at 40% of expected life, what is the claim procedure and who pays the freight?
Questions 2, 3 and 5 are the ones that cannot be bluffed by a trading company. A trader can answer 1 and 4 from a catalogue; the other three need a factory with records.
What an audit cannot tell you
An audit confirms capability, not consistency. A foundry can pass every check on the day you visit and still ship a heat with a delayed quench three months later. That is why the documents matter more than the visit: the per-heat analysis, the batch heat treatment record and the dimensional report are the audit that repeats on every order.
If you audit us, ask for exactly those three for any past order. We keep them by heat number. Start with the buying guide for the commercial side, and the liner material guide for the grade decision that the audit is meant to protect.
Auditing a supplier for a specific part?
Send the machine model and position — we will return the process route, the material grade and the inspection points, in writing, before you commit to an order.
Request a Quote